Optimization of Group Incentive Schemes

封面

如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅或者付费存取

详细

This paper considers the problem of motivating the reduction of project duration. The duration cuts of project works and the corresponding costs are given. A group incentive scheme is used to compensate for the costs. In this scheme, all works are partitioned into groups and a unified incentive scheme is applied for each group. Two types of unified incentive schemes are studied for groups, namely, linear and jump ones. The problem is to partition all project
works into groups and choose an appropriate incentive scheme for each group by minimizing the total incentive fund. Solution algorithms are proposed based on determining the shortest
path in the network. Special cases are also analyzed (partition with the minimum number of groups and partition with the maximum number of groups).

作者简介

V. Burkov

Trapeznikov Institute of Control Sciences, Russian Academy of Sciences

Email: vlab17@bk.ru
Moscow, Russia

I. Burkova

Trapeznikov Institute of Control Sciences, Russian Academy of Sciences

Email: irbur27@gmail.com
Moscow, Russia

A. Kashenkov

Vologda State Technical University

编辑信件的主要联系方式.
Email: alex27k@mail.ru
Vologda, Russia

参考

  1. Новиков Д.А. Стимулирование в организационных системах. М.: Синтег, 2003.
  2. Новиков Д.А., Цветков А.В. Механизмы стимулирования в многоэлементных организационных системах. М.: Апостроф. 2000.
  3. Бурков В.Н., Буркова И.В. и др. Механизмы управления: Мультифункциональное учебное пособие / Под ред. Д.А. Новикова. Изд. 2-е переработанное и доп. М.: ЛЕНАНД, 2013.

补充文件

附件文件
动作
1. JATS XML

版权所有 © The Russian Academy of Sciences, 2023